RockySea Petro Skid-mounted fracturing equipmentDescriptionIn the field of petroleum, hydraulic fracturing refers to a method of using hydraulic action to form fractures in oil and gas reservoirs during oil or gas production, also known as hydraulic fracturing. After a certain stage of oil well production, the production capacity and permeability decrease. In order to enhance oil drainage capacity and increase oil well production, people have invented fracturing technology. The methods of
VIEW DETAILSRockySea Petro Electromagnetic Diaphragm Metering PumpFeatureThe Electromagnetic diaphragm metering pump of RockySea Petro has the following advantages.1. The flow can be adjusted by manually adjusting the stroke to change the flow and adjusting the stroke frequency.2. It is easy to install and equipped with filter bottom valve, injection valve and inlet and outlet hoses.3. The pump head and flow passage parts made of corresponding materials shall be configured according to the corrosion performance r
VIEW DETAILSRockySea Petro Water Treatment DeviceIntegration Control,The soft water treatment and deaerator integration automatic control system are applied, featuring the cost savings and easy operation.Produced Water Reuse,Oilfield sewage can be used as steam injection boiler water supply, solving the oil field sewage and steam boiler water supply problem.Anti-corrosion.The tank are lined with anti-corrosion material (lining plastic) which is fixed firmly, strongly adhered, and hard to fall off.RockySea Petro water
VIEW DETAILSRockySea Petro Float Collar and FloatData sheetAdvantageRockySea has extensive experience in manufacturing float hoops and shoes, and its products have the following advantages.1) The reliable valve body structure reduces the resistance of cement slurry flow.2) All internal accessories are drillable and have the same diameter as the casing.3) The special structural design effectively prevents the backflow of cement slurry.4) The buckle can be processed into BTC/LTC/STC/VAM/FOX/TP-CQ/OTTM accordi
VIEW DETAILSRockySea Petro Rod PumpThe raw material of rod pump parts should be inspected after heat treatment, the mechanical properties, chemical compositions and metallographic structures must be inspected by batch. The rod pump parts should be inspected several times during the processing procedure. Some key points like the outer diameter of the plunger and the inner diameter of the pump barrel should be 100% inspected.Your Best Pump ManufacturersSealing performance tests must be carried out 100% after fini
VIEW DETAILSRockySea Petro Copyright © 2008-2025 Inc. SITEMAP