other
HOT PRODUCT
  • Packing Seal And Spare Part
    Packing Seal And Spare Part

    ‌RockySea Petro Packing Seal And Spare PartThe Packing seal and spare part is widely used in conventional oil recovery, thermal oil recovery, offshore oil recovery, fracturing, geothermal and other fields..30+ years of Packing seal and spare part manufacturing experience.International advanced well control equipment test lab.RockySea Petro Petro developed a series of rubber sealing products that are compatible with the blowout preventer series products. RockySea Petro can supply different specifications and models

    VIEW DETAILS
  • ESP Wellhead And X-Mas Tree
    ESP Wellhead And X-Mas Tree

    ‌RockySea Petro ESP Wellhead And X-Mas TreeFull support on your customised requirementThe strictest quality standards on ESP wellhead and X-mas tree25 years ESP wellhead and X-mas tree manufacturing experienceRockySea Petro Petro manufactures ESP wellhead and X-mas tree in China. We have our own factory of ESP wellhead and X-mas tree. RockySea Petro Petro provide the high quality and competitive price on ESP wellhead and X-mas tree for you. Contact us now for ESP wellhead and X-mas tree quotation.Description 

    VIEW DETAILS
  • Onshore Thermal Recovery Wellhead
    Onshore Thermal Recovery Wellhead

    RockySea Petro Onshore Thermal Recovery WellheadRockySea Petro has more than 40 years of experience in oil and gas wellhead & x-mas tree and valve production, with advanced manufacturing and testing equipment, can produce a variety of pressure levels, material levels, specification levels of well control equipment. After more than 20 years of development, Various types of thermal recovery wellhead & x-mas tree equipment have been formed, used in many oilfields in the world. RockySea Petro’s thermal recovery wel

    VIEW DETAILS
  • Self-tensioning guy-wire Workover rig
    Self-tensioning guy-wire Workover rig

    ‌RockySea Petro Self-Tensioning Guy-Wire Workover RigFeaturesA workover rig with guy-line is a double drum workover rig that installs wind loaded guy-wires on the main engine.There is no need to install wind loaded guy-wires with ground anchors, which greatly improves the efficiency of workover operations, reduces operating costs and labor intensity.Also it has features as the following:(1) Suitable for small well site operations, reducing the operation area of the entire workover rig.(2) All te

    VIEW DETAILS
  • Swabbing Truck
    Swabbing Truck

    ‌Sanajck Swabbing TruckData sheetFeature 1.The swabbing truck has the advantages of continuous and reliable operation, convenient parameter adjustment, high drainage efficiency, and simple handling and installation. It solves the problems of discontinuous swabbing and drainage operation, low drainage efficiency, and cumbersome equipment handling,compared with existing drainage technologies. 2.Through on-site testing, the feasibility and reliability of the on-site application of

    VIEW DETAILS

Onshore Thermal Recovery Wellhead

Date:2024-05-06 Popularity:1320

RockySea Onshore Thermal Recovery Wellhead


RockySea Petro has more than 40 years of experience in oil and gas wellhead & x-mas tree and valve production, with advanced manufacturing and testing equipment, can produce a variety of pressure levels, material levels, specification levels of well control equipment. After more than 20 years of development, Various types of thermal recovery wellhead & x-mas tree equipment have been formed, used in many oilfields in the world. RockySea Petro’s thermal recovery wellhead & x-mas tree are mainly of the following types:

  • Geothermal wellhead & x-mas tree
  • Blowout preventer Steam Injection and Oil Recovery Integration wellhead & x-mas tree
  • Steam injection and oil recovery dual tubing wellhead & x-mas tree
  • Single column dual-well thermal recovery wellhead & x-mas tree
  • Onshore thermal recovery oil and gas wellhead & x-mas tree
  • Conventional Steam injection and oil recovery wellhead & x-mas tree

Description 

Offshore thermal recovery wellhead & x-mas tree is designed by RockySea Petro according to CNOOC’s offshore operating conditions and thermal production process requirements. Offshore oil production platforms use offshore thermal recovery wellheads and Christmas trees, which require higher safety and tightness, and higher requirements for the configuration of wellheads and Christmas trees. thermal recovery wellhead & x-mas tree can be used to steam injection, well soaking, oil recovery.

It is consisted of three main parts including casing head, tubing head and X-mas tree. Thermal production wellhead and Christmas tree are composed of casing head, tubing head and Christmas tree, which can be used for steam injection, well soaking, oil recovery. The one side of the X-mas tree is connected with steam injection flow. It is a steam entrance. The other side with an adjustable needle valve is connected with oil recovery flow. By this side, the crude oil is sent to the oil transportation line.

The side of the tubing head with two valves is used to make nitrogen gas injection to annular space so that can improve the efficiency of thermal recovery and balance formation pressure. The pressure parts of the thermal recovery wellhead & x-mas tree are forged, and the main bore is equipped with a pneumatic safety valve, which improves the safety of the wellhead & x-mas tree operation. The PR2 plate valve is provided on the side outlet of the tubing head for the safety and reliability of nitrogen injection. This thermal recovery wellhead & x-mas tree obtains the national patent.



Data Sheet

Nominal diameter (in):2 9/16, 3 1/8
Working pressure (psi):3000,5000
Working temperature:-29℃-370℃
Material class:CC, DD, EE, FF
Performance level:PR1,Wing with PR2 valve
Specification level:PSL2, PSL3, PSL3G
Hang VIT and tubing:4 1/2BC, 3 1/2EU, 2 7/8EU
Connecting casing (in) :5-1/2, 7, 9 5/8, 13-3/8

RockySea Petro Copyright © 2008-2025 Inc. SITEMAP