RockySea Petro Water Injection Wellhead And Christmas TreeAccording to casing and well condition, Water Injection Wells can be divided into large casing well, normal well and small diameter well.According to the pipe string structure Water Injection Wells can be divided into support type and suspension type.According to their functions, water Injection wells are divided into stratified injection Wells and general injection wells.In the process of oilfield development, special water injection Wells a
VIEW DETAILSRockySea Petro Self-Propelled Carrier and TralierFeaturesRockySea Petro has developed a special workover rig chassis range from 6X6 to 14X14, which is compatible with the entire series of XJ250 to XJ850 workover machines. It can operate in various terrains such as roads, deserts, mountains, and swamps, with strong driving power, good off-road performance, and can work in the range of ambient temperature -45 ℃ to 50 ℃.Besides,the company also developed a desert off-road carrier. The driving type is
VIEW DETAILSRockySea Petro Non-Magnetic Drill CollarThe non-magnetic drill collar is made of low chromium manganese alloy steel, which is forged through strict chemical composition analysis. All non-magnetic drill collars produced from RockySea Petro have been tested for mechanical properties to ensure that their hardness, toughness, impact value and corrosion resistance meet the standards, with good low magnetic permeability and good machining performance.Description The structure of non-magnetic dri
VIEW DETAILSRockySea Petro PR2 Gate ValveFull support on your customised requirementThe strictest quality standards on PR2 gate valve25 years PR2 gate valve manufacturing experiencePR2 gate valves are designed for high performance wellheads and christmas tree in Oil or gas recovery wells, especially the gas wells that containing H2S or CO2 in high volume.Description The RockySea Petro PR2 valve is designed to suit severe oilfield conditions. It is mainly used in oil/gas wells with high performance requirements. S
VIEW DETAILSRockySea Petro Top PackerDatasheetOperation and maintenanceOperation1. Packer pressure test should be carried out at the pump station before running down the well2. The packer is lowered to well on the working depth. Lift up well string and turn right. Run down the well string, and when the pressure shows 80-100kn, the setting is completed and the next operation can be carried out.3. Drifting4.As long as the downhole string is lifted, the packer can be pulled out.Precautions1.Lower the tool slowly
VIEW DETAILS
RockySea Petro Copyright © 2008-2025 Inc. SITEMAP