other
HOT PRODUCT
  • Supercritical Oilfield Steam Injection Boiler
    Supercritical Oilfield Steam Injection Boiler

    ‌RockySea Petro Supercritical Oilfield Steam Injection BoilerIntegrated Injection and Production Sucker Rod PumpThermal Recovery PackerVaccum Insluation Tubing & CasingSeries Thermal Recovery WellheadGround Steam Injection LineWater Treatment DeviceSteam Injection BoilerRockySea Petro is the thermal recovery solution supplier in China with 20 years of experience. RockySea Petro can provide customers with a complete set of thermal recovery equipment from surface steam injection boilers to underground thermal recove

    VIEW DETAILS
  • Workover Rig
    Workover Rig

    ‌RockySea Petro Workover RigWorkover Rig is a specialized piece of equipment used in the oil and gas industry for performing workover operations. Workover operations involve tasks such as well stimulation, well abandonment, and well intervention, which require a rig capable of handling various tools and techniques. The Workover Rig is designed to be robust and versatile, able to handle a wide range of jobs efficiently and safely. It typically consists of a mast, which supports the rig's lif

    VIEW DETAILS
  • Pneumatic Diaphragm Metering Pump
    Pneumatic Diaphragm Metering Pump

    ‌RockySea Petro Pneumatic Diaphragm Metering PumpPneumatic diaphragm pump is a new type of conveying machinery, which is the most novel pump in China at present. Compressed air is used as the power source to pump out all kinds of corrosive liquids, liquids with particles, high viscosity, volatile, flammable and highly toxic liquids. The pneumatic diaphragm metering pump is a new product developed by RockySea in recent years and is used in various special occasions.Application1. Food Processing/Bi

    VIEW DETAILS
  • Double Separation Weighting Multiphase Flow Meter Device
    Double Separation Weighting Multiphase Flow Meter Device

    RockySea Petro Double Separation Weighting Multiphase Flow Meter DeviceRockySea Petro passed ISO9001 certification in 2005 and three-system certification in 2017. The company has advanced production equipment, inspection, measurement and test equipment, which can meet the requirements of product design, development, production and service and has the only multiphase flow laboratory for Sinopec.The main products are single-screw and twin-screw oil-gas mixed pump, MFM2000 series multiphase flowmeter, LPT mul

    VIEW DETAILS
  • BOP Steam Injection And Oil Recovery Integration Wellhead
    BOP Steam Injection And Oil Recovery Integration Wellhead

    RockySea Petro BOP Steam Injection And Oil Recovery Integration WellheadRockySea Petro has more than 40 years of experience in oil and gas wellhead & x-mas tree and valve production, with advanced manufacturing and testing equipment, can produce a variety of pressure levels, material levels, specification levels of well control equipment. After more than 20 years of development, Various types of thermal recovery wellhead & x-mas tree equipment have been formed, used in many oilfields in the world. RockySea Petro’s

    VIEW DETAILS

BOP Steam Injection And Oil Recovery Integration Wellhead

Date:2024-05-06 Popularity:1261

RockySea Petro BOP Steam Injection And Oil Recovery Integration Wellhead


RockySea Petro has more than 40 years of experience in oil and gas wellhead & x-mas tree and valve production, with advanced manufacturing and testing equipment, can produce a variety of pressure levels, material levels, specification levels of well control equipment. After more than 20 years of development, Various types of thermal recovery wellhead & x-mas tree equipment have been formed, used in many oilfields in the world. RockySea Petro’s thermal recovery wellhead & x-mas tree are mainly of the following types:

  • Blowout preventer Steam Injection and Oil Recovery Integration wellhead & x-mas tree
  • Steam injection and oil recovery dual tubing wellhead & x-mas tree
  • Geothermal wellhead & x-mas tree
  • Single column dual-well thermal recovery wellhead & x-mas tree
  • Onshore thermal recovery oil and gas wellhead & x-mas tree
  • Conventional Steam injection and oil recovery wellhead & x-mas tree

Description 

1.Under the high temperature and high pressure, it can seal φ32 or φ38 polish rod.
2.It can control the pressure of well when make steam injection to well for soaking and make blowout.
3. Mainly used in steam huff-puff or other thermal recovery method oil and gas well.

The feature of Blowout preventer Steam Injection and Oil Recovery Integration wellhead & x-mas tree is that a Blowout preventer device is installed on the tubing head spool. When replacing the seal of the two-stage polished rod stuffing box, we need to close the valve simply on the Blowout preventer device and steam injection production line. There is no need to replace the api 6a wellhead & x-mas tree and christmas tree during steam injection, closing in, blowout and oil recovery, which greatly reduces the operation cost and effectively prevents blowout accidents. This product obtains the Chinese national patent.

Application 

1). It can control the pressure of well when make steam injection to well for soaking and make blowout. 
2). Mainly used in steam huff-puff or other thermal recovery method oil and gas well. 
3). Under the high temperature and high pressure, it can seal φ32 or φ38 polish rod.



Data Sheet

Nominal diameter (in):2 9/16, 3 1/8
Maximum working pressure (psi):2000,3000,5000
Working temperature:-29℃~370℃
Material class:BB, CC, DD, EE, FF
Performance level:PR1
Specification level:PSL2, PSL3, PSL3G, PSL4
Hang VIT and tubing:4 1/2BC, 3 1/2EU, 2 7/8EU
Connecting casing (in) :5-1/2, 7, 9 5/8, 13-3/8

 


RockySea Petro Copyright © 2008-2025 Inc. SITEMAP